In Sharjah, your signage design needs SEDD pre-approval before it can be produced. K.A.T SIGNS prepares the technical drawings the Sharjah Economic Development Department expects, submits on your behalf, follows up until the design is cleared, and only then moves to fabrication, with permit fees itemised at cost. You get the design gate handled without standing in a single queue yourself.
What is SEDD design pre-approval?
SEDD design pre-approval is the Sharjah Economic Development Department signing off on your sign design before production. It confirms that the design, the displayed name and the Arabic content meet Sharjah requirements and match your trade licence. It is a design-stage gate, so passing it early prevents rejected fabrication and wasted cost later.
Think of it as approval of the artwork and specification, ahead of the physical signage pre-approval and the municipality stage. Clearing it first sets a compliant foundation that the rest of the Sharjah process builds on, which is why we treat it as the true starting point of any shopfront project.

Why does Sharjah require design pre-approval first?
Because Sharjah regulates what businesses display, and the licence is the reference. SEDD checks that your sign name matches the trade licence, that Arabic is present and correct, and that the design fits the rules for your activity and location. Clearing the design first means you do not commit materials and production time to artwork that would be refused.
It is a sequencing decision that saves money. Every issue caught at the design stage is an issue caught before any material is bought or any panel is cut, so the design gate is the cheapest possible place to resolve a problem, and we make full use of it.
Design first, produce later: we never fabricate a Sharjah sign before SEDD design pre-approval is in hand. That order protects your budget, because changes on paper cost far less than changes on a finished sign.
What does K.A.T SIGNS prepare for SEDD design approval?
We prepare a complete, submission-ready design package built to the department’s expectations, so the reviewer has everything needed to assess it in one pass.
- Scaled design artwork with the licence-matched name.
- Bilingual English and Arabic content, checked for accuracy.
- Dimensioned drawings and specification notes.
- Location and placement context where required.
- Any supporting documents the submission calls for.
How does the SEDD design approval process run?
It runs as a prepare, submit, follow-up and clear sequence, handled by us so you are not standing in queues or interpreting department feedback alone.
- Collect your trade licence and confirm the exact name and Arabic wording.
- Prepare the design and technical drawings to SEDD format.
- Submit the design for pre-approval on your behalf.
- Respond to any comments and re-submit as needed.
- Receive design clearance, then proceed to signage pre-approval and production.
What can delay a SEDD design approval?
The most common delays come from mismatched or missing details, all of which we screen for before submitting. The table shows the usual causes and how we head them off in advance.
Where it works best
- New storefront signage in Sharjah
- SEDD commercial licenses
- Signage compliance audits
SEDD Design Pre Approval
Sharjah Municipality Parking Reservation Approval
Government of Ajman











