Before a shopfront or building sign goes into production in Sharjah, it needs SEDD signage pre-approval. K.A.T SIGNS prepares the signage drawings and specifications the Sharjah Economic Development Department requires, submits on your behalf, and only fabricates once your sign is cleared, with permit fees itemised at cost. Nothing is cut until the clearance that legally allows production is in hand.
What is SEDD signage pre-approval?
SEDD signage pre-approval is the Sharjah Economic Development Department approving the physical sign itself, its size, type, placement and content, before it is manufactured and installed. It comes after the design stage and confirms the actual signage meets Sharjah rules and matches your trade licence. It is the clearance that legally allows production to begin.
Where design pre-approval clears the artwork, signage pre-approval clears the sign as a built object on your premises. The two are deliberately separate, because a compliant design can still become a non-compliant sign if the size or placement is wrong, and this gate catches exactly that.

Why is signage pre-approval separate from design approval?
Because Sharjah checks two different things. Design approval confirms the artwork and content, while signage pre-approval confirms the sign as it will physically exist, including dimensions, sign type and position on the facade. Treating them as separate steps means each is cleared properly, which is why we prepare a dedicated signage submission rather than assuming design approval is enough.
Skipping or rushing this gate is where projects go wrong. A sign that was never signage-approved can be refused or ordered removed after installation, turning a finished job into an expensive re-do, so we always secure signage pre-approval before committing anything to the workshop.
Cleared before we cut: we hold fabrication until SEDD signage pre-approval is issued. Producing a sign that has not been signage-approved risks rejection, removal and rework, so we never skip this gate.
What does K.A.T SIGNS submit for signage pre-approval?
We submit a signage-specific package that describes exactly what will be built and where, so the reviewer can assess the real sign rather than guess at it.
- Dimensioned signage drawings and elevations.
- Sign type and material specifications.
- Placement and facade context for the location.
- Bilingual English and Arabic content, licence-matched.
- Supporting documents required for the submission.
How does the SEDD signage approval process run?
It follows a clear prepare-and-clear sequence that we manage end to end, so the handoff from approval to production is seamless.
- Confirm the approved design and the licensed name.
- Prepare signage drawings, dimensions and specifications.
- Submit the signage pre-approval to SEDD on your behalf.
- Address any department comments and re-submit if needed.
- Receive signage clearance, then fabricate and install.
What does SEDD check on a signage submission?
SEDD reviews the sign against Sharjah rules and your licence. The table summarises the main checks we prepare for, so each one is satisfied before we submit.
| Check | What SEDD looks for | Our preparation |
|---|---|---|
| Name | Matches trade licence | Wording verified before submission |
| Language | Arabic present and correct | Bilingual content checked |
| Size and type | Within Sharjah rules | Dimensions and type specified |
| Placement | Correct facade position | Location context provided |
| Documents | Complete file | Checklist confirmed upfront |
SEDD Design Pre Approval
Sharjah Municipality Parking Reservation Approval
Government of Ajman









